subject
Chemistry, 28.02.2020 21:32 lbshel08

Say that the data path changes caused the clock period to change from 8ns (original LC2K) to 9ns (above data path). Say Finbarr Calamitous has a program where 10% of the instructions are ladd instructions. That program takes exactly 1 second to run on the new data path. How long would it take to run on the original data path if you replaced the ladd instructions with original LC2K instructions as you did in part b? Clearly show your work.

ansver
Answers: 2

Another question on Chemistry

question
Chemistry, 21.06.2019 18:50
Suppose you got a low yield of benzoin from your benzoin condensation reaction and thus only have 0.300 g of benzoin to use as the starting material for this reaction. how much concentrated nitric acid should you add? (concentrated nitric acid is 15.8 m). write your answer in the form x.xx ml
Answers: 1
question
Chemistry, 22.06.2019 01:00
Look at the bean data from days 4–6. use these data to explain how natural selection changed the number of dark red walking beans over time. writing part
Answers: 3
question
Chemistry, 22.06.2019 01:00
What are the variables in gay-lussac’s law? pressure and volume pressure, temperature, and volume pressure and temperature volume, temperature, and moles of gas
Answers: 1
question
Chemistry, 22.06.2019 18:00
Which three statements represent the benefits of performing experiments using computer simulations?
Answers: 2
You know the right answer?
Say that the data path changes caused the clock period to change from 8ns (original LC2K) to 9ns (ab...
Questions
question
Mathematics, 24.11.2020 20:10
question
Chemistry, 24.11.2020 20:10
question
History, 24.11.2020 20:10
question
Mathematics, 24.11.2020 20:10
Questions on the website: 13722363