After two precast concrete elements are joined, the exposed metal connectors (e. g., bolts, nuts, shim plates, etc.) that are not covered by a slab topping are usually: Select one: a. epoxy grouted together. b. covered with a spray-on fireproofing material. c. cut with a diamond-blade saw. d. ignored; there is no need to treat the connectors once the precast pieces are joined. e. dry-packed with Portland cement grout.

ansver
Answers: 2

Another question on Chemistry

question
Chemistry, 22.06.2019 05:00
Agas can holds 2.0 gal of gasoline. what is this quantity in cubic centimeters?
Answers: 2
question
Chemistry, 22.06.2019 22:30
What is the work done by the electric force to move a 1 c charge from a to b?
Answers: 2
question
Chemistry, 23.06.2019 00:00
The empirical formula of a compound is ch2o and its mass is 120 amu/molecule, what is its formula?
Answers: 1
question
Chemistry, 23.06.2019 02:30
Which is the most concentratic acid
Answers: 1
You know the right answer?
After two precast concrete elements are joined, the exposed metal connectors (e. g., bolts, nuts, sh...
Questions
question
Mathematics, 18.02.2020 17:23
question
Mathematics, 18.02.2020 17:24
Questions on the website: 13722362