An embankment construction requires the delivery of 38,200 m3 of the soil from a stockpile (d= 87 pcf, w=13%) to the construction site. the moisture content of the soil at the construction site is 9%. the compactors specifications indicate that the soil needs to be compacted to a minimum of 90% of modified proctor maximum dry unit weight. laboratory compaction tests yielded a maximum dry unit weight of 116 pcf. how much water (in cubic feet) must be added to the soil to increase its moisture content to the optimum moisture content of 14%

ansver
Answers: 1

Another question on Chemistry

question
Chemistry, 21.06.2019 18:00
When the following equation is balanced using the smallest possible integers, what is the coefficent of oxygen gas? c7h16o(g) + o2(g) → co2(g) + h2o(g) -1 -5 -8 -16 -21
Answers: 3
question
Chemistry, 22.06.2019 08:30
Which change in temperature is the smallest? a change of 1 thomson degree a change of 1 kelvin degree a change of 1 fahrenheit degree a change of 1 celsius degree
Answers: 1
question
Chemistry, 22.06.2019 14:30
How does a noncompetitive inhibitor reduce an enzyme’s activity?
Answers: 1
question
Chemistry, 23.06.2019 00:30
There are approximately 15 milliliters (ml) in 1 tablespoon (tbsp). what expression can be used to find the approximate number of milliliters in 3 tbsp?
Answers: 1
You know the right answer?
An embankment construction requires the delivery of 38,200 m3 of the soil from a stockpile (d= 87 p...
Questions
question
Arts, 01.12.2021 04:10
Questions on the website: 13722363