subject
Business, 01.07.2019 00:30 kcain1020

Pushing your body too hard at work or at play can?

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 07:20
Richardson hired j.c. flood company, a plumbing contractor, to correct a stoppage in the sewer line of her house. the plumbing company's 'snake' device, used to clear the line leading to the main sewer, became caught in the underground line. to release it, the company excavated a portion of the sewer line in richardson's backyard. in the process, the company discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. to meet public regulations, the water pipe, of a type no longer approved for such service, had to be replaced either then or later, when the yard would have to be excavated again. the plumbing company proceeded to repair the water pipe. though richardson inspected the company's work daily and did not express any objection to the extra work involved in replacing the water pipe, she refused to pay any part of the total bill after the company completed the entire operation. j.c. flood company then sued richardson for the costs of labor and material it had furnished. (c) for what, if anything, should richardson be liable? explain."
Answers: 1
question
Business, 22.06.2019 12:00
Need today! will get brainliest for right answer! compare and contrast absolute advantage and comparative advantage.
Answers: 1
question
Business, 22.06.2019 22:00
Suppose that a paving company produces paved parking spaces (q) using a fixed quantity of land (t) and variable quantities of cement (c) and labor (l). the firm is currently paving 1,000 parking spaces. the firm's cost of cement is $3 comma 600.003,600.00 per acre covered (c) and its cost of labor is $35.0035.00/hour (w). for the quantities of c and l that the firm has chosen, mp subscript upper c baseline equals 60mpc=60 and mp subscript upper l baseline equals 7mpl=7. is this firm minimizing its cost of producing parking spaces?
Answers: 3
question
Business, 23.06.2019 15:00
Wilmington company has two manufacturing departments--assembly and fabrication. it considers all of its manufacturing overhead costs to be fixed costs. the first set of data that is shown below is based on estimates from the beginning of the year. the second set of data relates to one particular job completed during the year--job bravo. estimated data assembly fabrication total manufacturing overhead costs $ 6,720,000 $ 7,280,000 $ 14,000,000 direct labor-hours 140,000 84,000 224,000 machine-hours 56,000 280,000 336,000 job bravo assembly fabrication total direct labor-hours 29 21 50 machine-hours 21 24 45 required: 1. if wilmington used a plantwide predetermined overhead rate based on direct labor-hours, how much manufacturing overhead would be applied to job bravo
Answers: 3
You know the right answer?
Pushing your body too hard at work or at play can?...
Questions
Questions on the website: 13722367