As an experienced construction project manager, you realize that almost all construction projects vary from the original design, scope, and definition due to technological advancement, statutory changes or enforcement, change in conditions, geological anomalies, non-availability of specified materials, or simply because of the continued development of the design after the contract has been awarded. In your project, the design requires thickness tolerances of 3/8 to -1/4 inch for slabs less than 12 inches and 112 to -3/8 inch for slabs more than 12 inches thick. Required:
In which document will the project manager document this if needed?

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 20:30
What is the difference between a public and a private corporation?
Answers: 1
question
Business, 22.06.2019 00:30
Needs to schedule the staffing of the center. it is open from 8am until midnight. larry has monitored the usage of the center at various times of the day and determined that the following number of computer consultants are required: time of dayminimum number of consultants required to be on duty8 am-noon4noon-4 pm84pm-8pm108pm-midnight6 two types of computer consultants can be hired: full-time and part-time. the full- time consultants work for eight consecutive hours in any of the shifts: morning (8am- 4pm), afternoon (noon-8pm) and evening (4pm-midnight). full-time consultants are paid $14 per hour. part-time consultants can be hired to work any of the four shifts listed in the table. part-time consultants are paid $12 per hour. an additional requirement is that during every time period, there must be at least two full-time consultants on duty for every part-time consultant on duty. larry would like to determine how many full-time and part-time consultants should work each shift to meet the above requirements at the minimum possible cost. formulate this as an lp problem. you must define your variables clearly
Answers: 2
question
Business, 22.06.2019 10:30
When sending a claim to an insurance company for services provided by the physician, why are both icd-10 and cpt codes required to be submitted? how are these codes dependent upon each other? what would be the result of not submitting both codes on a medical claim to an insurance company?
Answers: 2
question
Business, 22.06.2019 16:10
From what part of income should someone take savings?
Answers: 2
You know the right answer?
As an experienced construction project manager, you realize that almost all construction projects va...
Questions
Questions on the website: 13722360