Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 40 parts. A part requires 6 minutes in milling and 8 minutes in finishing. The move time between the two operations for a complete batch is 5 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 5 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time fill in the blank 1 min fill in the blank 2 min Non-value-added time fill in the blank 3 min fill in the blank 4 min Total lead time fill in the blank 5 min fill in the blank 6 min Value-added ratio (as a percent) fill in the blank 7 % fill in the blank 8 %

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 11:10
Post test question number 9 for entering the job market
Answers: 1
question
Business, 23.06.2019 03:30
What so u want to be when u grow up?
Answers: 1
question
Business, 23.06.2019 08:00
Ray gives his son, mason, three bowls. these bowls have the same capacity, but each one differs slightly in its shape and size. ray tells his son that one of the bowls can hold more liters of oil than the other two bowls. mason points out that all the bowls, though may appear different in size and shape, can store the same volume of oil. in this case, ray was most likely testing mason's concept of
Answers: 3
question
Business, 23.06.2019 11:20
In a hypothetical economy, a market basket consists of one laptop and two dvd players. in the base year, 2010, the price of a dvd player was $200, and the price of a laptop was $500. in 2015, the price of a dvd player was $380, and the price of a laptop was $750. the cpi for 2010 was
Answers: 3
You know the right answer?
Compute Lead Time Jackson Fabricators Inc. machines metal parts for the automotive industry. Under t...
Questions
question
Mathematics, 09.08.2019 02:30
Questions on the website: 13722361