subject
Business, 01.09.2019 00:30 kajjumiaialome

The following is correct statement related to the activity-based costing and traditional costing system, except:
a. an activity-based costing system is generally easier to implement and maintain than traditional costing system.
b. an activity-based costing system assigns both manufacturing and non-manufacturing costs to product.
c. an activity-based costing system does not assign all manufacturing costs to product.
d. activity-based costing uses multiple overhead rates based on multiple activity cost pools.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 02:30
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
question
Business, 22.06.2019 03:30
Joe finally found a house for sale that he liked. which factor could increase the price of the house he likes? a. both he and the seller each have a real estate agent. b. a home inspector finds faulty wiring in the house. c. the house has been for sale for almost a year. d. several buyers all want that same house.
Answers: 2
question
Business, 22.06.2019 03:40
Apharmaceutical packaging company (ppc) has decided to reorganize its processes into cells. the company has four different production operations, each requiring a unique piece of equipment. the names and functions of the four pieces of equipment are sort, count, place, and package. the company packages five different families of products (a, b, c, d, and e). the tables below indicate the demand (total units/day by product family), required operations, and operation cycle times for each product family. assume that any individual piece of equipment is available to operate 16 hours/day, but 2 hours (in total) are lost each day on each piece of equipment due to breaks and meetings when operators are not available to operate the equipment. how many minutes/day are available for production
Answers: 3
question
Business, 22.06.2019 15:40
The cost of direct labor used in production is recorded as a? a. credit to work-in-process inventory account. b. credit to wages payable. c. credit to manufacturing overhead account. d. credit to wages expense.
Answers: 2
You know the right answer?
The following is correct statement related to the activity-based costing and traditional costing sys...
Questions
question
History, 13.03.2021 03:20
question
Mathematics, 13.03.2021 03:20
question
Mathematics, 13.03.2021 03:20
question
Mathematics, 13.03.2021 03:20
question
Mathematics, 13.03.2021 03:20
Questions on the website: 13722362