subject
Business, 08.04.2021 17:00 tiwaribianca475

The product design group of Iyengar Electric Supplies Inc. has determined that it needs to design a new series of switches. It must decide on one of three design strategies. The market forecast is for 200,000 units. The better and more sophisticated the design strategy and the more time spent on value engineering, the less will be the variable cost. The chief of engineering design has decided that the following costs are a good estimate of the initial and variable costs connected with each of the three strategies: Low-tech: A low-technology, low cost process consisting of hiring several new junior engineers. This option has a fixed cost $45,000 and variable cost probabilities of 0.3 for $0.55 each, 0.4 for $0.50, and 0.3 for $0.45. Subcontract: A medium-cost approach using a good outside design staff. This approach would have a fixed cost of $65,000 and variable cost probabilities of 0.7 for $0.45, 0.2 for $0.40, and 0.1 for $0.35. High-tech: A high-technology approach using the very best if the inside staff and the latest computer-aided design technology. This approach has a fixed cost of $75,000 and variable-cost probabilities of 0.9 for $0.4 and 0.1 for $0.35. The best decision based on an expected monetary value criterion is [ Select ] with the expected cost of $ [ Select ] .

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 23:30
Sally mitchell works as a manager at an environmental organization. she is currently working on a global warming project and decides which tasks related to creating awareness about the issue need to be done. in addition, she is also deciding which members of her team will work on engaging with the public and which will work on lobbying with the government. she is also assigning people as team members to ensure that tasks are undertaken on time. which of the following categories of functions is mitchell undertaking? envisioning organizing controlling planning
Answers: 1
question
Business, 23.06.2019 01:10
1. alwaysrain irrigation, inc. would like to determine capacity requirements for the next four years. currently, two production lines are in place for making bronze and plastic sprinklers. three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. management has forecast demand for the next four years as follows: both production lines can produce all the different types of nozzles. the bronze machines needed for the bronze sprinklers require two operators and can produce up to 12,000 sprinklers. the plastic injection molding machine needed for the plastic sprinklers requires four operators and can produce up to 200,000 sprinklers. three bronze machines and only one injection molding machine are available. what are the capacity requirements for the next four years? (assume that there is no learning.)
Answers: 1
question
Business, 23.06.2019 02:30
For the year ended december 31, 2019, davidson mart had sales of $ 550 comma 000 and cost of goods sold of $ 412 comma 500. davidson estimates that approximately 2% of the merchandise sold will be returned. the adjusting journal entry on december 31, 2019, would include a
Answers: 3
question
Business, 23.06.2019 08:20
Mr. king wants to offer 100 acres of his property for sale. since the property is landlocked, he will have to put in a driveway to the road that will run across his remaining property. what kind of easement will he have to grant
Answers: 1
You know the right answer?
The product design group of Iyengar Electric Supplies Inc. has determined that it needs to design a...
Questions
Questions on the website: 13722367