subject
Business, 05.04.2021 23:20 mkn3347

Waterways packages some of its products into sets for home installations. One set (small) sells for $76 with variable costs of production for the set at $49. Another set (large) sells for $156 with variable costs of $102. The parts for the $76 set take 9 machine hours to produce. The parts for the $156 set take 20 machine hours to produce. Given the information above, and assuming all of the package sets produced can be sold each month, illustrate the best use of machine hours. (Round answers to 2 decimal places, e. g. 5.25.)
Contribution margin per unit of limited resource
Small Set
Large Set

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 16:00
Jelly has joined drakes team drake sends kelly an email explaining details of the project that she will be working on which of these is good etiquette
Answers: 3
question
Business, 22.06.2019 12:00
In the united states, one worker can produce 10 tons of steel per day or 20 tons of chemicals per day. in the united kingdom, one worker can produce 5 tons of steel per day or 15 tons of chemicals per day. the united kingdom has a comparative advantage in the production of:
Answers: 2
question
Business, 22.06.2019 13:10
Laval produces lamps and home lighting fixtures. its most popular product is a brushed aluminum desk lamp. this lamp is made from components shaped in the fabricating department and assembled in the assembly department. information related to the 22,000 desk lamps produced annually follows.direct materials $280,000direct labor fabricating department (8,000 dlh × $24 per dlh) $192,000assembly department (16,600 dlh × $26 per dlh) $431,600machine hours fabricating department $15,200mhassembly department $20,850mhexpected overhead cost and related data for the two production departments follow.fabricating assemblydirect labor hours 150,000dlh 295,000dlhmachine hours 161,000mh 128,000mhoverhead cost $400,000 430,000required1. determine the plantwide overhead rate for laval using direct labor hours as a base.2. determine the total manufacturing cost per unit for the aluminum desk lamp using the plantwide overhead rate.3. compute departmental overhead rates based on machine hours in the fabricating department and direct labor hours in the assembly department.4. use departmental overhead rates from requirement 3 to determine the total manufacturing cost per unit for the aluminum desk lamps.
Answers: 3
question
Business, 22.06.2019 18:00
*will mark brainliest! * when a company spends resources (labor, money) to give customers "free" items, those costs are called a. investment costs b. economic costs c. scarcity costs d. opportunity costs answer asap!
Answers: 1
You know the right answer?
Waterways packages some of its products into sets for home installations. One set (small) sells for...
Questions
question
Mathematics, 06.11.2020 01:00
question
Mathematics, 06.11.2020 01:00
question
Arts, 06.11.2020 01:00
question
Mathematics, 06.11.2020 01:00
question
Mathematics, 06.11.2020 01:00
Questions on the website: 13722362