subject
Business, 04.11.2020 18:20 Kinglilray998

The risk-free rate is 3.4 percent and the expected return on the market is 10.8 percent. Stock A has a beta of 1.18. For a given year, stock A returned 13.6 percent while the market returned 11.8 percent. The systematic portion of the unexpected return was percent and the unsystematic portion was percent.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 00:50
Cool beans is a locally owned coffee shop that competes with two large coffee chains, planeteuro and frothies. alicia, the owner, hired two students to count the number of customers that entered each of the coffee shops to estimate what percent of people who are interested in coffee are visiting each shop. after a week, the students found the following results: 589 visited cool beans, 839 visited planeteuro, and 1,290 visited frothies. the students were surprised that cool beans had 139 visits on monday which represented 59% of all people who visited one of the three coffee shops on mondays. how many people visited one of the three coffee shops during the week?
Answers: 2
question
Business, 22.06.2019 07:30
An important application of regression analysis in accounting is in the estimation of cost. by collecting data on volume and cost and using the least squares method to develop an estimated regression equation relating volume and cost, an accountant can estimate the cost associated with a particular manufacturing volume. consider the following sample of production volumes and total cost data for a manufacturing operation. production volume (units) total cost ($) 400 4000 450 5000 550 5400 600 5900 700 6400 750 7000 compute b 1 and b 0 (to 2 decimals if necessary). b 1 b 0 complete the estimated regression equation (to 2 decimals if necessary). = + x what is the variable cost per unit produced (to 1 decimal)? $ compute the coefficient of determination (to 4 decimals). note: report r 2 between 0 and 1. r 2 = what percentage of the variation in total cost can be explained by the production volume (to 2 decimals)? % the company's production schedule shows 500 units must be produced next month. what is the estimated total cost for this operation (to 2 decimals)? $
Answers: 1
question
Business, 22.06.2019 17:00
Serious question, which is preferred in a business? pp or poopoo?
Answers: 1
question
Business, 22.06.2019 19:30
Which of the following occupations relate to a skill category of words and literacy
Answers: 1
You know the right answer?
The risk-free rate is 3.4 percent and the expected return on the market is 10.8 percent. Stock A has...
Questions
question
Mathematics, 22.06.2019 07:00
question
Mathematics, 22.06.2019 07:10
Questions on the website: 13722363