Business, 05.10.2020 01:01 alialbinn6969
Make-or-Buy Decision Zion Manufacturing had always made its components in-house. However, Bryce Component Works had recently offered to supply one component, K2, at a price of $25 each. Zion uses 10,000 units of Component K2 each year. The cost per unit of this component is as follows: Direct materials $12.00 Direct labor 8.25 Variable overhead 4.50 Fixed overhead 2.00 Total $26.75 The fixed overhead is an allocated expense; none of it would be eliminated if production of Component K2 stopped. Required: 1. What are the alternatives facing Zion Manufacturing with respect to production of Component K2? Make the component in-house or buy it from Bryce 2. List the relevant costs for each alternative. If required, round your answers to the nearest cent. Total Relevant Cost Make $ 24.75 per unit Buy $ 25 per unit Differential Cost to Make $ 0.25 per unit If Zion decides to purchase the component from Bryce, by how much will operating income increase or decrease? Decrease $ 1.5 3. CONCEPTUAL CONNECTION: Which alternative is better?
Answers: 2
Business, 22.06.2019 12:00
Describe the three different ways the argument section of a cover letter can be formatted
Answers: 1
Business, 22.06.2019 12:50
You are working on a bid to build two city parks a year for the next three years. this project requires the purchase of $249,000 of equipment that will be depreciated using straight-line depreciation to a zero book value over the three-year project life. ignore bonus depreciation. the equipment can be sold at the end of the project for $115,000. you will also need $18.000 in net working capital for the duration of the project. the fixed costs will be $37000 a year and the variable costs will be $148,000 per park. your required rate of return is 14 percent and your tax rate is 21 percent. what is the minimal amount you should bid per park? (round your answer to the nearest $100) (a) $214,300 (b) $214,100 (c) $212,500 (d) $208,200 (e) $208,400
Answers: 3
Business, 22.06.2019 19:20
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
Make-or-Buy Decision Zion Manufacturing had always made its components in-house. However, Bryce Comp...
Mathematics, 02.08.2021 23:40
English, 02.08.2021 23:40
Spanish, 02.08.2021 23:50
Mathematics, 02.08.2021 23:50
Mathematics, 02.08.2021 23:50
English, 02.08.2021 23:50
Chemistry, 02.08.2021 23:50
Social Studies, 02.08.2021 23:50
History, 02.08.2021 23:50
Mathematics, 02.08.2021 23:50
Mathematics, 02.08.2021 23:50