subject
Business, 16.08.2020 01:01 DESI111609

Flagstaff, Inc. uses standard costing for its one product, baseball bats. The standards call for 3 board-feet of wood at $1.40 per board-foot, and 45 minutes of work at $12 per hour per bat. Total manufacturing overhead costs were estimated at $9,450, of which the variable portion was $0.50 per bat and the fixed portion was $1.00 per bat with an estimate of 6,300 bats to be produced. Flagstaff identifies price variances at the earliest possible point in time. During March, the company had the following results:Direct labor used = 4,800 hours at a cost of $56,400Actual manufacturing overhead fixed costs = $6,000Actual manufacturing overhead variable costs = $3,100Bats produced = 6,000Instructions Compute the following variances for March.
1. Labor quantity variance
2. Total labor variance
3. Overhead controllable variance
4. Overhead volume variance

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 10:30
Which maxim is being neglected in the following conversation? eli: how did you do at the track meet? caleb: i came in second place! eli: congratulations! what was your time? caleb: six minutes, four seconds. the guy who won only beat me by three seconds. eli: really? katie said the winning time was under 6 minutes. caleb: oh, well, he might have beat me by five seconds. a)maxim of quantity b)maxim of quality c)maxim of relevance d)maxim of manner
Answers: 1
question
Business, 22.06.2019 12:10
Compute the cost of not taking the following cash discounts. (use a 360-day year. do not round intermediate calculations. input your final answers as a percent rounded to 2 decimal places.)
Answers: 1
question
Business, 22.06.2019 14:00
The following costs were incurred in may: direct materials $ 44,800 direct labor $ 29,000 manufacturing overhead $ 29,300 selling expenses $ 26,800 administrative expenses $ 37,100 conversion costs during the month totaled:
Answers: 2
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
Flagstaff, Inc. uses standard costing for its one product, baseball bats. The standards call for 3 b...
Questions
Questions on the website: 13722359