subject
Business, 18.06.2020 18:57 Hahdhbd

Valerie, project manager, is managing a research project. Typically, research projects are not clearly defined and involve a lot of uncertainty. The project has four phases in which a phase can only start when its previous phase is complete. What project lifecycle and phase-to-phase relationship should Valerie use for this project?

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:30
White company has two departments, cutting and finishing. the company uses a job-order costing system and computes a predetermined overhead rate in each department. the cutting department bases its rate on machine-hours, and the finishing department bases its rate on direct labor-hours. at the beginning of the year, the company made the following estimates: department cutting finishing direct labor-hours 6,000 30,000 machine-hours 48,000 5,000 total fixed manufacturing overhead cost $ 264,000 $ 366,000 variable manufacturing overhead per machine-hour $ 2.00 " variable manufacturing overhead per direct labor-hour " $ 4.00 required: 1. compute the predetermined overhead rate for each department. 2. the job cost sheet for job 203, which was started and completed during the year, showed the following: department cutting finishing direct labor-hours 6 20 machine-hours 80 4 direct materials $ 500 $ 310 direct labor cost $ 108 $ 360 using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to job 203. 3. would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?
Answers: 3
question
Business, 22.06.2019 06:20
About time delivery co. incurred the following costs related to trucks and vans used in operating its delivery service: classify each of the costs as a capital expenditure or a revenue expenditure. 1. changed the oil and greased the joints of all the trucks and vans. 2. changed the radiator fluid on a truck that had been in service for the past four years. 3. installed a hydraulic lift to a van. 4. installed security systems on four of the newer trucks. 5. overhaul the engine on one of the trucks purchased three years ago. 6. rebuilt the transmission on one of the vans that had been driven 40,000 miles. the van was no longer under warranty. 7. removed a two-way radio from one of the trucks and installed a new radio with a greater range of communication. 8. repaired a flat tire on one of the vans. 9. replaced a truck's suspension system with a new suspension system that allows for the delivery of heavier loads. 10. tinted the back and side windows of one of the vans to discourage theft of contents.
Answers: 1
question
Business, 22.06.2019 09:30
Stock market crashes happen when the value of most of the stocks in the stock market increase at the same time. question 10 options: true false
Answers: 1
question
Business, 22.06.2019 12:50
Suppose the real risk-free rate and inflation rate are expected to remain at their current levels throughout the foreseeable future. consider all factors that affect the yield curve. then identify which of the following shapes that the u.s. treasury yield curve can take. check all that apply.
Answers: 2
You know the right answer?
Valerie, project manager, is managing a research project. Typically, research projects are not clear...
Questions
question
History, 06.01.2021 23:20
question
Mathematics, 06.01.2021 23:20
question
Mathematics, 06.01.2021 23:20
question
Engineering, 06.01.2021 23:20
Questions on the website: 13722362