subject
Business, 05.05.2020 19:12 patrickfutrell2537

Three engineers have the same amount of schooling and work experience, but earn different wages. One is a computer engineer who designs and tests new computers for an annual wage of $54,000 per year. Another is a chemical engineer who works in a nuclear lab and performs experiments on radioactive materials for an annual wage of $80,000 per year. The third is a civil engineer who performs daily inspections of cables on a suspension bridge for an annual wage of $91,000 per year.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 20:30
The hawthorne works was a large western electric factory with 45,000 employees. during the 1920s and 1930s, hawthorne works was the site of some well-known industrial studies. in one of the studies, researchers investigated the impact of different working conditions on worker productivity. prior to the start of the study, researchers secretly measured workers' productivity for several weeks. then researchers chose two workers, who then chose their own teams. the teams were separated from the general workforce and completed their work in different experiment rooms where the researchers could observe them more easily. over a 5-year period researchers manipulated the structure of the workday for each team (number and duration of breaks and number of hours per shift). for each of these changes in working conditions, the researchers measured the effect on productivity. for some conditions, such as frequent short breaks, workers rebelled by intentionally decreasing productivity.why did the researchers secretly measure the workers' productivity before creating the two treatment groups? a, to create similar treatment groups so that a cause-and-effect relationship could be establishedb, to draw conclusions about the productivity of all workers in the plant based on the test groupsc, to directly control for confounding variablesd, to provide a baseline for measuring worker productivity
Answers: 3
question
Business, 22.06.2019 02:40
Which critical success factor improves with reduced cycle time, better quality standards, and improved efficiency when an is is implemented?
Answers: 3
question
Business, 22.06.2019 11:30
Leon and sara are arguing over when the best time is to degrease soup. leon says that it's easiest to degrease soup when it's boiling. sara says it's easiest to degrease soup when it's cold. who is correct? a. neither leon nor sara is correct. b. leon is correct. c. both leon and sara are correct. d. sara is correct. student b   incorrect which following answer correct?
Answers: 1
question
Business, 22.06.2019 11:40
Zachary company produces commercial gardening equipment. since production is highly automated, the company allocates its overhead costs to product lines using activity-based costing. the costs and cost drivers associated with the four overhead activity cost pools follow: activities unit level batch level product level facility level cost $ 64,800 $ 27,730 $ 15,000 $ 154,000 cost driver 2,400 labor hrs. 47 setups percentage of use 11,000 units production of 780 sets of cutting shears, one of the company’s 20 products, took 240 labor hours and 7 setups and consumed 15 percent of the product-sustaining activities. required: (a) had the company used labor hours as a company wide allocation base, how much overhead would it have allocated to the cutting shears? (b) how much overhead is allocated to the cutting shears using activity-based costing? (c) compute the overhead cost per unit for cutting shears first using activity-based costing and then using direct labor hours for allocation if 780 units are produced. if direct product costs are $150 and the product is priced at 30 percent above cost for what price would the product sell under each allocation system? (d) assuming that activity-based costing provides a more accurate estimate of cost, indicate whether the cutting shears would be over- or underpriced if direct labor hours are used as an allocation base. explain how over-or undercosting can affect vaulker's profitability. (e) comment on the validity of using the allocated facility-level cost in the pricing decision. should other costs be considered in a cost- plus pricing decision? if so, which ones? what costs would you include if you were trying to decide whether to accept a special order?
Answers: 1
You know the right answer?
Three engineers have the same amount of schooling and work experience, but earn different wages. One...
Questions
question
Mathematics, 24.11.2020 03:10
question
Mathematics, 24.11.2020 03:10
question
Chemistry, 24.11.2020 03:10
question
Mathematics, 24.11.2020 03:10
question
Social Studies, 24.11.2020 03:10
Questions on the website: 13722360