subject
Business, 06.05.2020 06:34 lmimms02

DVDs can be produced at a constant marginal cost, and Roaring Lion Studios is releasing the DVDs for its last two major films. The DVD for Rambeau 17 is priced at $20 per disk, and the DVD for Schreck 10 is priced at $30 per disk. If the Lerner indices for Rambeau 17 divided by the Lerner index for Schreck 10 equals 0.5, what is the constant marginal cost of producing both DVDs?

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 20:50
Your goal is to have $2,000,000. you have a total of $40,000 today. you invest the $40,000 and want to add to it each month. at 10% annual interest, how much do you need to invest each month in order to bring the total up to $2,000,000 30 years from now?
Answers: 2
question
Business, 22.06.2019 02:30
Question 1 which of the following tasks use your roommate as a resource? choose all answers which apply. take order wash the mixer’s bowl and mix the dough spoon cookies onto the tray unload the cookies from the oven pack the cookies 1 points question 2 which of the following tasks use the tray(s) as a resource? choose all answers which apply. take order wash the mixer’s bowl and mix the dough bake the cookies cool the cookies accept payment 1 points question 3 determine the task time for the following tasks. fill integer numbers into the blank (e.g., 5 rather than 5.0) wash and mixing the dough: minute(s)/order spoon cookies onto the tray: minute(s)/order set up timer: minute(s)/order bake: minute(s)/order cool the cookies: minute(s)/order pack the cookies: minute(s)/order accept payment: minute(s)/order 2 points question 4 q4: determine the cycle time for the following resources. fill integer numbers into the blank (e.g., 5 rather than 5.0) kristen (you): minute(s) roommate: minute(s) oven: minute(s) 2 points question 5 what is the capacity rate (in orders/hour) of the roommate? 1 points question 6 what is the capacity rate (in orders/hour) of the whole process? 2 points question 7 how long (in minutes) it takes to process the first order?
Answers: 3
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
question
Business, 22.06.2019 23:30
Sally has a high-paying management position with a fortune 500 company, but she is tired of working for corporate america. so sally has decided to start a business, and she knows she will be successful as an entrepreneur because entrepreneurs typically
Answers: 3
You know the right answer?
DVDs can be produced at a constant marginal cost, and Roaring Lion Studios is releasing the DVDs for...
Questions
question
Arts, 18.12.2019 23:31
Questions on the website: 13722362