A second method for determining the forecasted cost at completion assumes that, regardless of the efficiency rate the project or work package has experienced in the past, the work to be performed on the remaining portion of the project or work package will be done according to budget. If the cumulative actual cost is greater than the cumulative earned value, then Group of answer choices the FCAC is greater than the TBC. the FCAC cannot be calculated with the values given. the FCAC is less than the TBC. additional information is needed to predict the FCAC.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 03:30
Sarah salesrep is brand new to her job selling "lifetime" printers that never need replacement ink cartridges. the problem is that these printers cost ten times more than a regular printer, so it is difficult to get prospective buyers to understand the cost savings of buying it. to break through the barrier and begin making sales, sarah should use a analysis that highlights her printer's lower cost.
Answers: 3
question
Business, 22.06.2019 04:00
Medtronic, inc., is a medical technology company that competes for customers with st. jude medical s.c., inc. james hughes worked for medtronic as a sales manager. his contract prohibited him from working for a competitor for one year after leaving medtronic. hughes sought a position as a sales director for st. jude. st. jude told hughes that his contract with medtronic was unenforceable and offered him a job. hughes accepted. medtronic filed a suit, alleging wrongful interference. which type of interference was most likely the basis for this suit? did it occur here? medtronic, inc., is a medical technology company that competes for customers with st. jude medical s.c., inc. james hughes worked for medtronic as a sales manager. his contract prohibited him from working for a competitor for one year after leaving medtronic
Answers: 2
question
Business, 22.06.2019 05:00
One question from a survey was "how many credit cards do you currently have? " the results of the survey are provided. complete parts (a) through (g) below. click the icon to view the survey results. (a) determine the mean number of credit cards based on the raw data. the mean is 3.113.11 credit cards. (type an integer or a decimal. do not round.) (b) determine the standard deviation number of credit cards based on the raw data. the standard deviation is 1.9111.911 credit cards. (round to three decimal places as needed.) (c) determine a probability distribution for the random variable, x, the number of credit cards issued to an individual. x (# of cards) p(x) x (# of cards) p(x) 1 0.280.28 6 nothing 2 nothing 7 nothing 3 nothing 8 nothing 4 nothing 9 nothing 5 nothing 10 nothing (type integers or decimals. do not round.)
Answers: 2
question
Business, 22.06.2019 16:00
Three pounds of material a are required for each unit produced. the company has a policy of maintaining a stock of material a on hand at the end of each quarter equal to 30% of the next quarter's production needs for material a. a total of 35,000 pounds of material a are on hand to start the year. budgeted purchases of material a for the second quarter would be:
Answers: 1
You know the right answer?
A second method for determining the forecasted cost at completion assumes that, regardless of the ef...
Questions
Questions on the website: 13722361