subject
Business, 07.04.2020 19:07 sahaitong1844

The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 185 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are in total six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 80 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 205 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if need arises, it can add a second shift of eight hours for the assembly lines. The product is sold at $3 per unit. Assume that the cost of a drilling machine (fixed cost) is $34,000 and the company produces 8,200 units per week. Assume that four drilling machines are used for production. If the company had an option to buy the same part at $2 per unit, what would be the break-even number of units? (Round your answer to the nearest whole number.) Break-even point?

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 18:20
Which of the following housing decisions provides a person with both housing and an investment? a. selling a share in a cooperative. b. buying a single-family home. c. renting an apartment. d. subletting a condominium. 2b2t
Answers: 2
question
Business, 21.06.2019 22:50
Which of the following statements is true? a job costing system will have a separate work in process account for each of the major processes. a process costing system will have a single work in process account. a process costing system will have a separate raw materials account for each of the major processes. a process costing system will have a separate work in process account for each of the major processes.
Answers: 3
question
Business, 22.06.2019 18:50
Plastic and steel are substitutes in the production of body panels for certain automobiles. if the price of plastic increases, with other things remaining the same, we would expect: a) the demand curve for plastic to shift to the left. b) the price of steel to fall. c) the demand curve for steel to shift to the left d) nothing to happen to steel because it is only a substitute for plastic. e) the demand curve for steel to shift to the right
Answers: 3
question
Business, 22.06.2019 19:50
The new york company produces high quality chairs. variable manufacturing overhead is applied at a standard rate of $12 per machine hour. each chair requires a standard quantity of six machine hours. production for the month totaled 4,000 units. calculate: the standard cost per unit for variable overhead. select one: a. $130,000 b. $192,000 c. $90,000 d. $100,000
Answers: 2
You know the right answer?
The Goodparts Company produces a component that is subsequently used in the aerospace industry. The...
Questions
question
Chemistry, 31.08.2019 06:50
question
Mathematics, 31.08.2019 06:50
Questions on the website: 13722367