Business, 30.03.2020 23:34 benjaminbooth10

Mike Miller is the town manager of Medfield, a town with 50,000 residents. At a recent town meeting, several citizens proposed building a large public swimming pool in the center of town for all of the residents to enjoy. A survey of all 50,000 residents revealed that the pool would be worth $50 to each of them. The cost to build the swimming pool is $1,000,000.
Which of the following is the most efficient option?

a. The pool should not be built because the social value does not exceed the cost.
b. The pool should be built and paid for by the town government and paid for with a tax on the residents because all residents would benefit from it but some residents would not donate if they were asked.
c. The pool should be built and paid for by the wealthiest ten percent of the residents.
d. The pool should be built and paid for with donations collected from residents, as these donations should more than cover the cost of the pool.

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 21:30
Problem 2-18 job-order costing for a service company [lo2-1, lo2-2, lo2-3]speedy auto repairs uses a job-order costing system. the company's direct materials consist of replacement parts installed in customer vehicles, and its direct labor consists of the mechanics' hourly wages. speedy's overhead costs include various items, such as the shop manager's salary, depreciation of equipment, utilities, insurance, and magazine subscriptions and refreshments for the waiting room. the company applies all of its overhead costs to jobs based on direct labor-hours. at the beginning of the year, it made the following estimates: direct labor-hours required to support estimated output 10,000fixed overhead cost $ 90,000variable overhead cost per direct labor-hour $ 1.00 required: 1. compute the predetermined overhead rate.2. during the year, mr. wilkes brought in his vehicle to replace his brakes, spark plugs, and tires. the following information was available with respect to his job: direct materials $ 600direct labor cost $ 180direct labor-hours used 2 compute mr. wilkes' total job cost. 3. if speedy establishes its selling prices using a markup percentage of 30% of its total job cost, then how much would it have charged mr. wilkes?
Answers: 1
question
Business, 22.06.2019 02:30
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
question
Business, 22.06.2019 08:00
Who is not spending wisely? erika goes shopping and saves her receipts. she totals how much she spent and writes it down. mia needs to buy a new pair of shoes because she joined the soccer team. she looks at newspaper ads to find the best price. lauren has been thinking about getting a puppy for a long time. she walks by the pet store at the mall and decides to get a puppy. erin makes a purchase online using a credit card. she knows that she can pay the entire bill when it arrives.
Answers: 2
question
Business, 22.06.2019 16:00
In microeconomics, the point at which supply and demand meet is called the blank price
Answers: 3
You know the right answer?
Mike Miller is the town manager of Medfield, a town with 50,000 residents. At a recent town meeting,...
Questions
question
Biology, 05.05.2021 21:40
question
Social Studies, 05.05.2021 21:40
question
Chemistry, 05.05.2021 21:40
question
Physics, 05.05.2021 21:40
question
Chemistry, 05.05.2021 21:40
Questions on the website: 13722359