subject
Business, 13.03.2020 23:58 LaytonHall79

Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products from buildings. There has been a long-simmering dispute between the company’s estimator and the work supervisors.

The on-site supervisors claim that the estimators do not adequately distinguish between routine work such as removal of asbestos insulation around heating pipes in older homes and nonroutine work such as removing asbestos-contaminated ceiling plaster in industrial buildings. The on-site supervisors believe that nonroutine work is far more expensive than routine work and should bear higher customer charges. The estimator sums up his position in this way: "My job is to measure the area to be cleared of asbestos. As directed by top management, I simply multiply the square footage by $2.80 to determine the bid price. Since our average cost is only $2.58 per square foot, that leaves enough cushion to take care of the additional costs of nonroutine work that shows up. Besides, it is difficult to know what is routine or not routine until you actually start tearing things apart."

To shed light on this controversy, the company initiated an activity-based costing study of all of its costs. Data from the activity-based costing system follow:

Activity Cost Pool Activity Measure Total Activity Removing asbestos Thousands of square feet 800 thousand squarefeet Estimating and job setup Number of jobs 400 jobs Working on nonroutine jobs Number of nonroutine jobs 100 nonroutine jobs Other (costs of idle capacity and organization-sustaining costs) None Note: The 100 nonroutine jobs are included in the total of 400 jobs. Both nonroutine jobs and routine jobs require estimating and setup.

Costs for the Year Wages and salaries $ 372,000
Disposal fees 775,000
Equipment depreciation 96,000
On-site supplies 58,000
Office expenses 280,000
Licensing and insurance 480,000
Total cost $ 2,061,000

Distribution of Resource Consumption Across Activities Removing Asbestos Estimating and Job Setup Working on Nonroutine Jobs Other Total Wages and salaries 60 % 10 % 20 % 10 % 100 % Disposal fees 60 % 0 % 40 % 0 % 100 % Equipment depreciation 50 % 10 % 15 % 25 % 100 % On-site supplies 70 % 20 % 10 % 0 % 100 % Office expenses 10 % 40 % 20 % 30 % 100 % Licensing and insurance 25 % 0 % 60 % 15 % 100 %

Required:

1. Perform the first-stage allocation of costs to the activity cost pools.

2. Compute the activity rates for the activity cost pools.

3. Using the activity rates you have computed, determine the total cost and the average cost per thousand square feet of each of the following jobs according to the activity-based costing system. (Round the "Average cost" to 2 decimal places.)

a. A routine 1,000-square-foot asbestos removal job.
b. A routine 2,000-square-foot asbestos removal job.
c. A nonroutine 2,000-square-foot asbestos removal job.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 21:30
You invest all the money you earned during your summer sales job (a total of $45,000) into the stock of a company that produces fat and carb-free cheetos. the company stock is expected to earn a 14% annual return; however, 5 years later it is only worth $20,000. turns out there wasn't as much demand for fat and carb-free cheetos as you had hoped. what is the annual rate of return on your investment?
Answers: 1
question
Business, 22.06.2019 02:30
Acompany factory is considered which type of resource a.land b.physical capital c.labor d.human capital
Answers: 2
question
Business, 22.06.2019 11:40
Manipulation manufacturing's (amm) standards anticipate that there will be 5 pounds of raw material used for every unit of finished goods produced. amm began the month of maymay with 8,000 pounds of raw material, purchased 25,500 pounds for $ 15,300 and ended the month with 7,400 pounds on hand. the company produced 4,9004,900 units of finished goods. the company estimates standard costs at $ 1.10 per pound. the materials price and efficiency variances for the month of maymay were:
Answers: 1
question
Business, 22.06.2019 12:50
Kendrick is leaving his current position at a company, and charlize is taking over. kendrick set up his powerpoint for easy access for himself. charlize needs to work in the program that is easy for her to use. charlize should reset advanced options
Answers: 3
You know the right answer?
Mercer Asbestos Removal Company removes potentially toxic asbestos insulation and related products f...
Questions
question
Social Studies, 22.01.2020 12:31
question
Social Studies, 22.01.2020 12:31
Questions on the website: 13722367