subject
Business, 10.03.2020 02:09 Vanesssajohn6294

Aleutian Company produces two products: Rings and Dings. They are manufactured in two departments: Fabrication and Assembly. Data for the products and departments are listed below. Product Number of Units Direct Labor Hours Per Unit Machine Hours Per Unit Rings 1,000 5 6 Dings 2,040 5 11 All of the machine hours take place in the Fabrication Department, which has estimated total factory overhead of $85,200. All of the labor hours take place in the Assembly Department, which has estimated total factory overhead of $65,400. Aleutian Company uses the multiple production department factory overhead rate method. The Fabrication Department uses machine hours as an allocation base, and the Assembly Department uses direct labor hours. The Fabrication Department's factory overhead rate is a.$4.95 per direct labor hour b.$2.91 per direct labor hour c.$4.30 per machine hour d.$3.00 per machine hour

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 03:40
Apharmaceutical packaging company (ppc) has decided to reorganize its processes into cells. the company has four different production operations, each requiring a unique piece of equipment. the names and functions of the four pieces of equipment are sort, count, place, and package. the company packages five different families of products (a, b, c, d, and e). the tables below indicate the demand (total units/day by product family), required operations, and operation cycle times for each product family. assume that any individual piece of equipment is available to operate 16 hours/day, but 2 hours (in total) are lost each day on each piece of equipment due to breaks and meetings when operators are not available to operate the equipment. how many minutes/day are available for production
Answers: 3
question
Business, 22.06.2019 19:10
Imagine us is a startup that offers high definition 3d prenatal ultrasounds for high-end customers. the service process includes four activities that are conducted in the sequence described below. (the time required for each activity is shown in parentheses): activity 1: welcome a patient and explain the procedure. (20 minutes)activity 2: prep the patient (e.g., show them to the room, apply ultrasound gel). (17 minutes) (*your id number represents the amount of time needed to complete this task)activity 3: take images. (5 minutes)activity 4: discuss diagnostic with patient. (20 minutes)at each location there are employees (servers) s1, s2, and s3. the assignment of tasks to servers is the following: s1 does activities 1 and 2.s2 does activity 3.s3 does activity 4.a. what is the capacity of this process (in customers per hour)? b. suppose 3 patients arrive every hour on average. ignoring any “start of day” or “end of day” effects, what are the utilizations of all three servers (%)? c. suppose each activity can be done by any server and any server can do any set of activities. however, each activity is done by only one server. for example, a possible assignment includes: s1 does activity 1, s2 does activity 2, and s3 does activities 3 and 4. of course, the original assignment of servers to activities is also feasible. what is the maximum capacity of the process (in customers per hour)? d. now consider the capacity measures in (c) and (a), what is the percentage change? why can you improve capacity without using additional resources? (there is no free lunch, right? )note: for all hw assignments, show your process of getting the results. only providing the final answers is not acceptable and will get 0%. if necessary, use a separate sheet of paper to show your work.
Answers: 3
question
Business, 22.06.2019 20:00
Question 6 of 102 pointswhich situation shows a constant rate of change? oa. the number of tickets sold compared with the number of minutesbefore a football gameob. the height of a bird over timeoc. the cost of a bunch of grapes compared with its weightod. the outside temperature compared with the time of day
Answers: 1
question
Business, 22.06.2019 20:00
On january 1, year 1, purl corp. purchased as a long-term investment $500,000 face amount of shaw, inc.’s 8% bonds for $456,200. the bonds were purchased to yield 10% interest. the bonds mature on january 1, year 6, and pay interest annually on january 1. purl uses the effective interest method of amortization. what amount (rounded to nearest $100) should purl report on its december 31, year 2, balance sheet for these held-to-maturity bonds?
Answers: 1
You know the right answer?
Aleutian Company produces two products: Rings and Dings. They are manufactured in two departments: F...
Questions
question
English, 26.05.2021 14:00
question
Mathematics, 26.05.2021 14:00
question
Physics, 26.05.2021 14:00
question
Social Studies, 26.05.2021 14:00
question
Chemistry, 26.05.2021 14:00
question
Mathematics, 26.05.2021 14:00
question
Chemistry, 26.05.2021 14:00
question
Mathematics, 26.05.2021 14:00
Questions on the website: 13722367