subject
Business, 04.03.2020 03:25 kiararoman1715

Valuetronics, an electronics company, is currently in the preproduction stage of launching one of its new stereo systems. In order to analyze the feasibility of the product, Valuetronics adopts an integrated system that allows it to manufacture the product before it physically exists, that is, the system allows Valuetronics to finalize the design of the stereo, analyze it, and do a test-run. In this context, Valuetronics is using a:.a. enterprise resource planning (ERP) system b. flexible manufacturing system (FMS) c. computer-aided engineering (CAE) system d. computer-aided manufacturing (CAM) system

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 20:30
As a group is leaving, you ask them if they had a good experience at the restaurant. they mention that they had poor service and their food was cold. a.apologize and ask them to give the restaurant another chance in the future. you tell them that guests usually have a great experience here. b.apologize then ask for the server’s name and immediately notify the manager after they leave. c.apologize for the bad experience and ask them to wait as you call the manager to talk to them. d.apologize for the bad experience and encourage them to complete the customer service survey. this feedback will ensure other guests do not have the same experience.
Answers: 2
question
Business, 22.06.2019 15:20
Abank has $132,000 in excess reserves and the required reserve ratio is 11 percent. this means the bank could have in checkable deposit liabilities and in (total) reserves.
Answers: 3
question
Business, 22.06.2019 18:10
Ashop owner uses a reorder point approach to restocking a certain raw material. lead time is six days. usage of the material during lead time is normally distributed with a mean of 42 pounds and a standard deviation of four pounds. when should the raw material be reordered if the acceptable risk of a stockout is 3 percent?
Answers: 1
question
Business, 22.06.2019 18:30
Amanufacturer has paid an engineering firm $200,000 to design a new plant, and it will cost another $2 million to build the plant. in the meantime, however, the manufacturer has learned of a foreign company that offers to build an equivalent plant for $2,100,000. what should the manufacturer do?
Answers: 1
You know the right answer?
Valuetronics, an electronics company, is currently in the preproduction stage of launching one of it...
Questions
question
Mathematics, 06.07.2019 02:30
Questions on the website: 13722361