subject
Business, 28.02.2020 21:26 sweetcandy16gaming

He Scott family and the Cox family each used their sprinklers last summer. The water output rate for the Scott family's sprinkler was
35L
per hour. The water output rate for the Cox family's sprinkler was
25L
per hour. The families used their sprinklers for a combined total of
45
hours, resulting in a total water output of
1275L
. How long was each sprinkler used?

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 19:50
One investigating company tracked all credit card purchase during 2012 and measured two variables: (1) the type of credit card used (visa, mastercard, american express, or discover), and (2) the amount (in dollars) of each purchase. identify the level of each variable measured.
Answers: 1
question
Business, 22.06.2019 11:10
The prebisch–singer hypothesis concludes that: a. technology lowers the cost of manufactured products, so developing countries should see an increase in their terms of trade. b. developing countries experience a long-run decline in their terms of trade, as the demand for primary products in higher-income countries declines relative to their demand for manufactured goods. c. because of unfair trading practices, labor in developing countries is exploited. d. opec has been responsible for a slowdown in the world's standard of living.
Answers: 3
question
Business, 22.06.2019 11:40
Jamie is saving for a trip to europe. she has an existing savings account that earns 3 percent annual interest and has a current balance of $4,200. jamie doesn’t want to use her current savings for vacation, so she decides to borrow the $1,600 she needs for travel expenses. she will repay the loan in exactly one year. the annual interest rate is 6 percent. a. if jamie were to withdraw the $1,600 from her savings account to finance the trip, how much interest would she forgo? .b. if jamie borrows the $1,600 how much will she pay in interest? c. how much does the trip cost her if she borrows rather than dip into her savings?
Answers: 1
question
Business, 22.06.2019 16:40
Job 456 was recently completed. the following data have been recorded on its job cost sheet: direct materials $ 2,418 direct labor-hours 74 labor-hours direct labor wage rate $ 13 per labor-hour machine-hours 137 machine-hours the corporation applies manufacturing overhead on the basis of machine-hours. the predetermined overhead rate is $14 per machine-hour. the total cost that would be recorded on the job cost sheet for job 456 would be: multiple choice $3,380 $5,298 $6,138 $2,622
Answers: 1
You know the right answer?
He Scott family and the Cox family each used their sprinklers last summer. The water output rate for...
Questions
question
Spanish, 20.04.2020 04:19
question
Mathematics, 20.04.2020 04:19
question
Mathematics, 20.04.2020 04:19
question
Mathematics, 20.04.2020 04:19
question
Chemistry, 20.04.2020 04:19
question
Mathematics, 20.04.2020 04:19
Questions on the website: 13722367