subject
Business, 17.02.2020 23:31 babiibri4771

Mountaineer excavation operates in a low-lying area that is subject to heavy rains and flooding. because of this, mountaineer purchases one year of flood insurance in advance on march 1, paying $36,000 ($3,000/month).
Required:
1. Recore the purchase of insurance in advance on March,1.
1. Record the adjusting entry on December, 31.

ansver
Answers: 2

Another question on Business

question
Business, 21.06.2019 16:10
Visburg concrete company pours concrete slabs for single-family dwellings. lancing construction company, which operates outside visburg's normal sales territory, asks visburg to pour 40 slabs for lancing's new development of homes. visburg has the capacity to build 300 slabs and is presently working on 250 of them. lancing is willing to pay only $3, 300 per slab. visburg estimates the cost of a typical job to include unit-level materials, $1, 440: unit-level labor, $720: and an allocated portion of facility-level overhead, $1, 200. required calculate the contribution to profit from the special order. should visburg accept or reject the special order to pour 40 slabs for $3, 300 each?
Answers: 2
question
Business, 22.06.2019 04:40
How long have u been on dis website
Answers: 2
question
Business, 22.06.2019 22:20
David consumes two things: gasoline (q 1) and bread (q 2). david's utility function is u(q 1, q 2)equals70q 1 superscript 0.5 baseline q 2 superscript 0.5. let the price of gasoline be p 1, the price of bread be p 2, and income be y. derive david's demand curve for gasoline. david's demand for gasoline is q 1equals nothing. (properly format your expression using the tools in the palette. hover over tools to see keyboard shortcuts. e.g., a subscript can be created with the _ character.)
Answers: 1
question
Business, 23.06.2019 00:30
Activity-based costing (abc) is not truly a cost collection mechanism as much as it is an inventory valuation method. the main purpose for implementing an activity-based cost system is to try to overcome some of the cost distortions that occur in traditional costing from product differences when there are variations in size and complexity. however, one of the disadvantages of utilizing abc is that the additional information gathering necessary to implement costing with that level of detail might be beyond the reach of some companies with resource or financial constraints. with this in mind, what kinds of industries or companies do you think would benefit most from using activity-based costing and why? in designing or modifying an accounting system to capture appropriate costs for abc, what considerations do you think would need to be made?
Answers: 3
You know the right answer?
Mountaineer excavation operates in a low-lying area that is subject to heavy rains and flooding. bec...
Questions
question
Mathematics, 25.11.2020 04:50
Questions on the website: 13722359