subject
Business, 13.02.2020 21:40 janessa0804

The preferred method for situations involving strategic decision making, projects with a high degree of uncertainty, and projects with an unstable scope is the approach to estimating project time and costs.

ansver
Answers: 1

Another question on Business

question
Business, 21.06.2019 19:30
Which p shifts to consumer in the four cs of the alternate marketing mix? a) promotion b) product c) place d) price
Answers: 3
question
Business, 22.06.2019 22:40
Effective capacity is the: a. capacity a firm expects to achieve given the current operating constraints.b. minimum usable capacity of a particular facility.c. sum of all the organization's inputs.d. average output that can be achieved under ideal conditions.e. maximum output of a system in a given period.
Answers: 1
question
Business, 23.06.2019 00:00
1. consider a two-firm industry. firm 1 (the incumbent) chooses a level of output qı. firm 2 (the potential entrant) observes qı and then chooses its level of output q2. the demand for the product is p 100 q, where q is the total output sold by the two firms which equals qi +q2. assume that the marginal cost of each firm is zero. a) find the subgame perfect equilibrium levels of qi and q2 keeping in mind that firm 1 chooses qi first and firm 2 observes qi and chooses its q2. find the profits of the two firms-n1 and t2- in the subgame perfect equilibrium. how do these numbers differ from the cournot equilibrium? b) for what level of qi would firm 2 be deterred from entering? would a rational firm 1 have an incentive to choose this level of qi? which entry condition does this market have: blockaded, deterred, or accommodated? now suppose that firm 2 has to incur a fixed cost of entry, f> 0. c) for what values of f will entry be blockaded? d) find out the entry deterring level of q, denoted by q1', a expression for firm l's profit, when entry is deterred, as a function of f. for what values of f would firm 1 use an entry deterring strategy?
Answers: 3
question
Business, 23.06.2019 05:40
Which two tasks does an industry safety and health engineer perform?
Answers: 1
You know the right answer?
The preferred method for situations involving strategic decision making, projects with a high degree...
Questions
question
Biology, 08.06.2020 16:57
Questions on the website: 13722361