subject
Business, 16.01.2020 21:31 bailey814

Suppose the firm considers a second product that has a unit profit of $5 and requires 2 hours for each unit produced. assume total production capacity remains 40. use y as the number of product 2 produced. a. show the mathematical model when both products are considered simultaneously. b. identify the controllable and uncontrollable inputs for this model. c. draw the flowchart of the input-output process for this model. d. what are the optimal solution values of x and y? e. is the model developed a deterministic or a stochastic model? explain.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 02:00
Southeastern bell stocks a certain switch connector at its central warehouse for supplying field service offices. the yearly demand for these connectors is 15,000 units. southeastern estimates its annual holding cost for this item to be $25 per unit. the cost to place and process an order from the supplier is $75. the company operates 300 days per year, and the lead time to receive an order from the supplier is 2 working days.a) find the economic order quantity.b) find the annual holding costs.c) find the annual ordering costs.d) what is the reorder point?
Answers: 2
question
Business, 22.06.2019 06:00
Select the correct answer a research organization conducts certain chemical tests on samples. they have data available on the standard results. some of the samples give results outside the boundary of the standard results. which data mining method follows a similar approach? o a. data cleansing ob. network intrusion o c. fraud detection od. customer classification o e. deviation detection
Answers: 1
question
Business, 22.06.2019 09:00
Drag the tiles to the correct boxes to complete the pairs.(there's not just one answer)match each online banking security practice with the pci security requirement that mandates it.1. encrypting transfer of card data2. installing a firewall3. installing antivirus software4. assigning unique ids and user namesa. vulnerability management programb. credit card data protectionc. strong access controlsd. secure network
Answers: 3
question
Business, 22.06.2019 19:40
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
You know the right answer?
Suppose the firm considers a second product that has a unit profit of $5 and requires 2 hours for ea...
Questions
question
Mathematics, 19.08.2020 03:01
question
History, 19.08.2020 03:01
question
Mathematics, 19.08.2020 03:01
Questions on the website: 13722361