You have been asked to determine the standard cost for each personalized stepping stone manufactured by a stone and tile company. each customized stone requires one stone, 3 ounces of paint, 45 minutes of direct labor (engraving, painting, packaging), and a box for packaging. you receive the following cost information: the company applies overhead at a rate of $12.40 per direct labor hour, and fringe benefits for workers are an additional 25% of wages. what is the standard cost of producing one small stepping stone?

a : $10.52
b : $37.16
c : $17.34
d : $27.86

ansver
Answers: 2

Another question on Business

question
Business, 22.06.2019 06:30
Individual consumers belong to which step of choosing a target market? possible customers competition demographics communication
Answers: 2
question
Business, 22.06.2019 11:30
On average, someone with a bachelor's degree is estimated to earn times more than someone with a high school diploma. a)1.2 b)1.4 c)1.6 d)1.8
Answers: 1
question
Business, 22.06.2019 16:40
Match the situations that will develop one's personality and those that won't peter is surrounded by friends who are always encouraging him jonathan always watches television when he wants to take a break from his books libby sets small targets for herself and strives to achieve them. the smiths indulge in an animated discussion on varied topics every evening after dinner. brook loves junk food and exercises once in a while. develops your personality develops doesn't develop your personality
Answers: 2
question
Business, 22.06.2019 19:50
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
You have been asked to determine the standard cost for each personalized stepping stone manufactured...