subject
Business, 03.09.2019 17:10 kkbrookly6195

Return to the lemons game in section 11.3, and consider the same structure, except suppose there are just two quality levels: low and high. the buyer initially assigns probability q to a car’s being of high quality and probability 1 - q to its being of low quality. if the seller sells the car, then her payoff is the price the buyer paid. if the car is not sold, assume that it is worth $10,000 to the seller if it is of high quality and $6,000 if it is of low quality; those are the payoffs. the value of the car to the buyer is $12,000 if it is of high quality and $7,000 if it is of low quality. if the buyer purchases the car, then the buyer’s payoff is the car’s value—which is $12,000 or $7,000—less the price paid; his payoff is zero if he does not buy the car. find values for q such that there is a pbne with pooling.

ansver
Answers: 1

Another question on Business

question
Business, 22.06.2019 11:20
Mae jong corp. issues $1,000,000 of 10% bonds payable which may be converted into 10,000 shares of $2 par value ordinary shares. the market rate of interest on similar bonds is 12%. interest is payable annually on december 31, and the bonds were issued for total proceeds of $1,000,000. in accounting for these bonds, mae jong corp. will: (a) first assign a value to the equity component, then determine the liability component. (b) assign no value to the equity component since the conversion privilege is not separable from the bond.(c) first assign a value to the liability component based on the face amount of the bond.(d) use the “with-and-without” method to value the compound instrument.
Answers: 3
question
Business, 22.06.2019 19:40
Moody corporation uses a job-order costing system with a plantwide predetermined overhead rate based on machine-hours. at the beginning of the year, the company made the following estimates: machine-hours required to support estimated production 100,000 fixed manufacturing overhead cost $ 650,000 variable manufacturing overhead cost per machine-hour $ 3.00 required: 1. compute the plantwide predetermined overhead rate. 2. during the year, job 400 was started and completed. the following information was available with respect to this job: direct materials $ 450 direct labor cost $ 210 machine-hours used 40
Answers: 3
question
Business, 22.06.2019 20:20
Levine inc., which produces a single product, has prepared the following standard cost sheet for one unit of the product. direct materials (9 pounds at $1.80 per pound) $16.20 direct labor (6 hours at $14.00 per hour) $84.00 during the month of april, the company manufactures 270 units and incurs the following actual costs. direct materials purchased and used (2,500 pounds) $5,000 direct labor (1,660 hours) $22,908 compute the total, price, and quantity variances for materials and labor.
Answers: 2
question
Business, 22.06.2019 21:30
What term is used to describe the outsourcing of logistics? a. shipper managed inventoryb. hollow logistics(smi)c. sub-logisticsd. e-logisticse. third-party logistics (3pl)
Answers: 1
You know the right answer?
Return to the lemons game in section 11.3, and consider the same structure, except suppose there are...
Questions
question
Mathematics, 26.05.2021 23:10
question
Mathematics, 26.05.2021 23:10
question
Mathematics, 26.05.2021 23:10
Questions on the website: 13722367