subject
Business, 19.08.2019 17:30 carrie85

For risk events outside project control, resolution strategies include working with clients to prioritize cost, schedule, scope of quality and carefully escalate problems.
true / false.

ansver
Answers: 3

Another question on Business

question
Business, 21.06.2019 21:10
Auniversity spent $1.8 million to install solar panels atop a parking garage. these panels will have a capacity of 400 kilowatts (kw) and have a life expectancy of 20 years. suppose that the discount rate is 20%, that electricity can be purchased at $0.10 per kilowatt-hour (kwh), and that the marginal cost of electricity production using the solar panels is zero. hint: it may be easier to think of the present value of operating the solar panels for 1 hour per year first. approximately how many hours per year will the solar panels need to operate to enable this project to break even? a. a.3,696.48 b.14,785.92 c.9,241.20 if the solar panels can operate only for 8,317 hours a year at maximum, the project (would/would not)break even?
Answers: 1
question
Business, 22.06.2019 04:50
Harwood company uses a job-order costing system that applies overhead cost to jobs on the basis of machine-hours. the company's predetermined overhead rate of $2.50 per machine-hour was based on a cost formula that estimates $240,000 of total manufacturing overhead for an estimated activity level of 96,000 machine-hours. required: 1. assume that during the year the company works only 91,000 machine-hours and incurs the following costs in the manufacturing overhead and work in process accounts: compute the amount of overhead cost that would be applied to work in process for the year and make the entry in your t-accounts. 2a. compute the amount of underapplied or overapplied overhead for the year and show the balance in your manufacturing overhead t-account. 2b. prepare a journal entry to close the company's underapplied or overapplied overhead to cost of goods sold.
Answers: 1
question
Business, 22.06.2019 21:10
You are the manager of a large crude-oil refinery. as part of the refining process, a certain heat exchanger (operated at high temperatures and with abrasive material flowing through it) must be replaced every year. the replacement and downtime cost in the first year is $165 comma 000. this cost is expected to increase due to inflation at a rate of 7% per year for six years (i.e. until the eoy 7), at which time this particular heat exchanger will no longer be needed. if the company's cost of capital is 15% per year, how much could you afford to spend for a higher quality heat exchanger so that these annual replacement and downtime costs could be eliminated?
Answers: 1
question
Business, 22.06.2019 21:40
Which of the following is one of the main causes of inflation? a. wages drop so workers have to spend a higher percentage of income on necessities. b. demand drops and forces producers to charge more to meet their costs. c. rising unemployment cuts into national income. d. consumers demand goods faster than they can be supplied.
Answers: 3
You know the right answer?
For risk events outside project control, resolution strategies include working with clients to prior...
Questions
question
English, 01.06.2021 01:00
question
Geography, 01.06.2021 01:00
question
Business, 01.06.2021 01:00
question
Mathematics, 01.06.2021 01:00
Questions on the website: 13722360