subject
Business, 23.06.2019 02:40 Jorianes

Some years ago it was estimated that the demand for steel approximately satisfied the equation p=194-25x x, and the total cost of producing x units of steel was upper c left parenthesis x right parenthesis equals 145 plus 40 x. (the quantity x was measured in millions of tons and the price and total cost were measured in millions of dollars.) determine the level of production and the corresponding price that maximize the profits.

ansver
Answers: 3

Another question on Business

question
Business, 22.06.2019 04:30
The lee family is looking to buy a house in one of two suburban areas just outside of a major city, and air quality is a top priority for them. overall air quality is calculated by taking measures in 100 locations within each suburb and then calculating a measure of central tendency. in one suburb, there is a major bus station that creates very poor air quality at its location but has no impact in the surrounding parts of the suburb. in this situation, which measure of overall suburb air quality would be most useful?
Answers: 3
question
Business, 22.06.2019 04:30
What is the second step in communication planning? determine the purpose of the message outline the communication for delivery determine the best channel of communication clarify objectives identify the audience
Answers: 2
question
Business, 22.06.2019 11:40
Zachary company produces commercial gardening equipment. since production is highly automated, the company allocates its overhead costs to product lines using activity-based costing. the costs and cost drivers associated with the four overhead activity cost pools follow: activities unit level batch level product level facility level cost $ 64,800 $ 27,730 $ 15,000 $ 154,000 cost driver 2,400 labor hrs. 47 setups percentage of use 11,000 units production of 780 sets of cutting shears, one of the company’s 20 products, took 240 labor hours and 7 setups and consumed 15 percent of the product-sustaining activities. required: (a) had the company used labor hours as a company wide allocation base, how much overhead would it have allocated to the cutting shears? (b) how much overhead is allocated to the cutting shears using activity-based costing? (c) compute the overhead cost per unit for cutting shears first using activity-based costing and then using direct labor hours for allocation if 780 units are produced. if direct product costs are $150 and the product is priced at 30 percent above cost for what price would the product sell under each allocation system? (d) assuming that activity-based costing provides a more accurate estimate of cost, indicate whether the cutting shears would be over- or underpriced if direct labor hours are used as an allocation base. explain how over-or undercosting can affect vaulker's profitability. (e) comment on the validity of using the allocated facility-level cost in the pricing decision. should other costs be considered in a cost- plus pricing decision? if so, which ones? what costs would you include if you were trying to decide whether to accept a special order?
Answers: 1
question
Business, 22.06.2019 12:50
Performance bicycle company makes steel and titanium handle bars for bicycles. it requires approximately 1 hour of labor to make one handle bar of either type. during the most recent accounting period, barr company made 7,700 steel bars and 2,300 titanium bars. setup costs amounted to $35,000. one batch of each type of bar was run each month. if a single company-wide overhead rate based on direct labor hours is used to allocate overhead costs to the two products, the amount of setup cost assigned to the steel bars will be:
Answers: 2
You know the right answer?
Some years ago it was estimated that the demand for steel approximately satisfied the equation p=194...
Questions
question
Arts, 27.06.2019 15:50
question
Arts, 27.06.2019 15:50
question
Mathematics, 27.06.2019 15:50
question
Biology, 27.06.2019 15:50
Questions on the website: 13722367